The Forms are Stripped, The Cellar takes Shape

Posted on January 9, 2012

The Second to Last Foundation Pour!!!

Posted on January 6, 2012

The Next Few Days, Forms are Constructed/Braced

Posted on January 5, 2012

New Year Brings the Final Foundation Walls

  The wall forms are lined up in place and made ready for installation. At the existing adjacent foundation, since the existing wall (with rigid insulation) will form one side of of the wall, a complicated, customized one-sided form system is used by Pepe. This requires a method of bracing the one-sided form properly to …

Posted on January 3, 2012

Footing Forms Stripped, Insulation Installed

  On New Years Eve day, Julio from Pepe’s crew relaxes with a soda after stripping the footing forms in preparation for the construction of the final foundation wall forms after the New Year.

Posted on December 31, 2011

Final Footings Poured

  The footings against the existing adjacent rubble foundation wall are set up above the new cellar slab elevation in order to avoid any undermining of the existing support material of the adjacent structure. You can note the stepped down footing when we pass the existing cellar foundation of the adjacent building. The pipe sleeve …

Posted on December 30, 2011

Footings are Formed Adjacent to the Existing Foundation Wall

Posted on December 29, 2011

The Walls are Now Backfilled

Posted on December 28, 2011

And the Rigid Insulation/Moisture-Proofing is Installed…

Posted on

Foundation Drainage Installs Rather Easily

  Now that the walls are poured, the perimeter drainage piping, encased in gravel and filter fabric, are installed. 

Posted on December 27, 2011